Projects

McCreary County KY Federal Prison

 

Design build project to construct a new 1100 man medium security prison and work camp.  The project included furnishing and installing 15KV incoming switchgear with a double loop primary feeder system and isolation switches around the entire facility.  Additionally, we furnished and installed three 2000KW, 15KV emergency generators and the associated 15KV paralleling switchgear.  We also provided and installed the conduit system, copper cables and fiber optic cables throughout the facility for the security, telephone, fire alarm, CCTV and MATV systems.  This project was completed on budget and two months ahead of schedule. 

 

Read More...

Walton County Justice Facilitty

Furnish and install the electrical system for a new Justice Center, which includes a 34,000 square foot Jail, a 30,000 sq. ft. Administration Building, a 25,000 sq. ft. Sheriff’s Office, as well as, all required site work including site lighting. This is a design/build project and we are working closely with the Architect and the Electrical Engineering firm to ensure the best project for the money. While this project encompasses all types of low-voltage systems, there is a systems contractor on this project. Our responsibilities for the systems are to coordinate with the systems contractor to install the correct size of raceways, boxes, etc. to ensure that the systems function correctly.
 
Read More...

Yazoo City Federal Correctional Insitution

Our work included both the Design & Electrical Construction for the entire electrical system and Security Systems including CCTV, MATV, Fire Alarm, Paging, fiber optic interfaces, control consoles and door lock systems to provide housing for 1100 prisoners.  The electrical systems included 15KV Incoming Service Switchgear, 12-15KV Selector Switches & Power Transformers, a double loop 15KV primary distribution system around the site including manholes and concrete encased duct banks.  The outdoor lighting system included furnishing and installing 16-100ft high mast poles and 160-1000 watt fixtures.  This is the first and to date only facility of its type to have had the entire Division 17 Security Systems installed, tested and accepted by the FBOP on or before the scheduled date.  

 
Read More...