Projects

Alabama Telco Credit Union

CECE, Inc. worked with D.L. Action Construction to build the new Dothan, AL branch for Alabama Telco Credit union.

Read More...

AT & T Mobility Renovation

After teh buy-out of Altell by AT&T, CECE, Inc. worked with Duffey Southeast to renovate the existing facility from the Altell design to meet the AT&T needs for retail space.

Read More...

BamaJam Farms Water Park

The BamaJam Farms Water Park is an addition to the BamaJam farms providing fun for the entire family.  Multiple water slides into the water, Granny's Clothes Line offers the individual the ability to ride a zip line above the pool and drop in.  Rope swings around the edge and a Pirate ship for the kids.  The Pavilion in close proximity offers food and drinks as well as a stage for performances.

Read More...

Flying J Travel Plaza

 CECE, Inc. worked with PDG, Inc. to construct the Dothan, AL FLying J Travel Plaza.  Thsi facility includes a dine-in restuarant, a togo order counter, sales area, truck driver rest facility (showers), plus a weight scale for over the road trucking companies.

Read More...

St. Columba Catholic Church

Construct a new 26,000 square foot Worship Center. This project includes furnishing and installing all power equipment, lighting and lighting control system and fire alarm system. An empty conduit system is to be installed for the audio/visual system. The lighting system includes the installation of cold cathode lighting.

 
Read More...