Port St. Joe Surface Water Treatment Plant



Location: Port St Joe, FL
General Contractor: Marshall Brothers, Inc.
Architect: Preble-Rish, Inc.
Owner: City of Port St Joe
Electrical Contract Amount: $3,344,803


This project is to build the City of Port St. Joe an new fully automated 6 million gallon per day Surface Water Treatment Plant.  The project includes the installation of complete and operational electrical and process instrumentation systems.  We are responsible for all electrical wiring for two clear wells, four clarifiers, a bulk chemical storage area, a 2 million gallon ground storage tank, and various other support facilities.  The electrical line-up includes a 3000 Amp transfer switch, a 3000 Amp switchboard, two 800 Amp motor control centers to be used to control pumps and motors of the plant.  A complete raceway system for the Data Highway Cables and specialty cable systems are to be installed as well as conduit, wiring, and terminations for variable frequency drives, harmonic filters, transformers and power facto correction capacitors.